| Commissioning of cable car | 1975 |
| Until present daily visitors have been safely transported |
over 7 million
|
| Capacity of cable car cabins | 80 persons |
| Drive capacity | ca. 500 KW |
| Height of pillars | 54 m |
| Structural system | Double cable |
| Cable length |
2.156 Meter |
| Cable diameter |
54 mm |
| Cable weight | 16 kg per metre |
| Cable tensile strength | ca. 100 t |
| Number of rolls per travelling mechanism | 24 |
| Maximum total load (gross) | ca. 12 t |
| Lifts | Capacity (P/h) | mountain station (m.a.s.l) | Valley station (m.a.s.l) | Lenght (m) | Travel time (min) |
|---|---|---|---|---|---|
| Grawand | 800 | 3.200 | 3.013 | 807 | 4,5 |
| Finail-Finale 1 & 2 |
615 x 2
|
3.113 | 2.863 |
1.473
|
9
|
| Gletschersee 1 |
1.024 | 3.011 | 2.772 | 527 |
4
|
| Gletschersee 2 | 1.800 | 3.011 | 2.772 | 527 |
4
|
| Hintereis | 1.200 | 3.258 | 2.774 |
1.702
|
10
|
| Lazaun | 1.028 | 2.430 | 1.999 |
1.301
|
9
|
| Glocken 1 & 2 |
900 x 2 | 2.073 | 2.010 | 340 |
1,5
|
| Roter Kofel |
1.800 | 2.450 | 2.027 | 1.770 | 6 |
| Teufelsegg | 1.800 | 3.034 | 2.444 |
1.805
|
7
|